Maintenance Day
After running the new server as a slave database for a while and ensuring things are working as expected, I scheduled a maintenance downtime to move the system into its proper place: A 4U rack-mounted case.
Server cabin prior to the switch
A closer look at Borak
A complete mess of cables at the back of the rack
Borak, all powered down and pulled out of the cabin
Opening up Borak to see the mess. Note the extra fan placed on top of the RAM modules. This was necessary to keep them from overheating.
Removing some cables
Done emptying the case...
... and cleaned off the dust
Motherboard installed
Adding the power supply
Installing drives
Completed internals
Here's a before and after:
Exterior view, all closed up